As seen at WindEurope 2026

Never miss a

Wind farms, solar parks, and BESS assets generate thousands of documents. For every DD or handover, the first question is always:

“Do we have everything we need?”

Get the case study

We ran Aevy's gap analysis on a real wind and solar portfolio. Here's what it found.

The Problem — Renewable Energy Due Diligence

Manual document checks are quietly eating your timeline.

Every wind and solar asset DD or AM handover involves thousands of documents — O&M contracts, inspection reports, grid agreements, land leases, warranties. Data room analysis is still done by hand.

80%

Decisions made on partial information

DD teams assess risks without seeing what’s missing from the dataroom.

3-5

Days lost per DD on verification alone

Analysts spend days confirming every document is present before real analysis can begin.

1 in 3

Asset managers miss critical deadlines

Phase-in checklists in Excel break down once you’re managing more than a handful of assets.

100%

Of handovers require a full redo

No audit trail, no way to build on the last team’s work.

Based on Aevy analysis of renewable energy transactions

Want to see the full picture?

Get the case study →